Installing new roofing or new siding comprising more than 25% of the total roofing or siding area in a calendar year
Installing a generator
Any natural gas or propane work
Installing an oil tank
Renovating a kitchen
Installing a pool or spa (in-ground or above ground)
Erecting a shed
Erecting a large tent
Demolishing a structure
Enclosing a porch
Installing a gas or wood burning stove or fireplace
Changing the size/location of windows, window replacements or adding a bay window
Doing interior alterations
Installing lawn sprinkler systems
A Building Permit must be activated within 6 months or the permit shall become null and void. The applicant may request, in writing, a ninety (90) day extension of the permit.